Lines are going down




Saved melted snow from Puget Sound Hockey Center is poured on to the new Tacoma Twin Rinks





Making Ice


Freezing Sand

Laying Sand



Boards are here and coming in



Pad for Lift is filled in

Glass railing for South Mezzanine



laying the cooling pipes and under the ground heating system, separated by vapor barriers and insulation.














Looking at the café/bar from the south rink

Under the Rink Heating system’s headers

Skate Rental Counter w/roll up door

South Scoreboard is ready to be hung

Dirt is leveled and ready for heat system



Exterior wall is closing up


ProShop gets heat

Main staircase gets installed

Door to future Skate rental room and Zamboni room

Locker room 1

Locker room 1

Showers for locker 1 and 2

Bathroom for locker rooms 1 and 2

Locker room 2

Locker room 2

Locker room 3

Showers for Locker rooms 3 and 4

Bathroom for locker rooms 3 and 4

Locker room 4

Future Locker room for possible Junior or Men’s League Team


Team Coaches’ office


Team’s shower and bathroom



Windows are being framed for the food/beverage service

Cooling pipes are installed through the Zamboni Room

New Views from upstairs

Zamboni and Skate counter walls are starting to be framed downstairs, between the rinks

Exterior walls of South Locker Rooms are primed

Upstairs Mezzanine continues to get concrete floor

Future weight room



Future 2 offices upstairs and Elevator landing

Future home of our food/beverage service

Stairs are installed and concrete for steps is poured on the South Staircase

South Wall is extended and going back up

South wall continues to come down

South wall is starting to come down for new extension

Electrical upgrade is complete for building

New Chiller is getting plumbed to the South Rink

New South Exterior Wall and extension is delivered!!!

Interior walls are starting to be closed up for South Locker Rooms

Asphalt is covered the new parking spots

Concrete is poured for ice rink curbing of South rink.


Steal supports are going up in lobby

New Electrical panel and vault installed for increased 2000amps

Running supply and return pipes for new rinks from the Chiller

Plumbing Vents for new bathrooms in locker rooms for the South Rink

New Electrical conduit ran under rink for new locker rooms

Concrete is poured for the south Mezzanine floor and ceiling of locker rooms

Zamboni room floor is poured

Main Glycol lines, sub terrain through the Zamboni room